Skip to content

Partner efforts help river herring upstream

No Close
1. Massachusetts Environmental Trust Grants (FY2016) includes partner project in Boxford
2. Stream Continuity and Infrastructure Assessment Project Update
3. Great Marsh Awarded Federal Wetlands Grant
4. Marsh Adaptation Strategy Tool (MAST)
5. King Tides and Sea Level Rise
6. MyCoast Tracks Coastal Storms
7. PIE Rivers Annual Meeting Promotes the Power of Partnerships
8. New Flooding and Sea Level Rise Maps Aid Resiliency Planning Efforts
9. Essex Tech Students Study Plum Island Beach Movement
10. COAST Analysis of Newburyport
11. Planning Partners Report Progress
12. Ipswich River Re-opens to Shellfishing
13. Partners remove over 600 tires during “Turtle Land” cleanup
14. Greenbelt One Step Closer to Protecting Leonhard-Eldred Farm
15. Native Plantings and Sand Fencing Help Beach Dune Restoration
16. Improved fish ladder proposed for Willowdale Dam
17. Dune Resiliency Efforts on Salisbury Beaches
18. EPA Releases Stormwater Permit
19. Greenbelt Steps Closer to Conserving Sagamore Hill
20. Ipswich High Students Explore Sea Level Rise
21. PIE-Rivers Partners Gather for Great Marsh Resiliency Modeling Workshop
22. Communities Plan for Living Shorelines
23. Local Students Give Presentations on Sea Level Rise and Storm Surge Impacts
24. Partner efforts help river herring upstream
25. Communities Take Action on Resiliency
26. Survey Work Begins at Ipswich Mills Dam
27. Town of Ipswich Receives Coastal Resiliency Grant
28. Ipswich Dam Team Visits Exeter Restoration Project
29. Nanotags: Understanding large landscape connections using nano-technology
30. Coastal Resiliency Planning Project Works on Solutions
31. PIE-Rivers Partnership Annual Meeting 2016
32. Great Marsh Sea Level Rise Symposium: Implications for Quality of Life in Our Communities
33. Greenbelt Hosts Inaugural Essex County Open Space Conference
34. Salt Marsh Science Project Celebrated 20th Anniversary
35. 2016 PIE-Rivers Annual Meeting
36. EPA Releases Dam Removal FAQ
37. Choate Island Forest Clearing Project
38. Partners Protect Castle Neck Headwaters
39. Wenham and Boxford receive DER assistance to upgrade degraded culverts
40. PIE-Rivers Partnership Annual Meeting 2017
41. PIE-Rivers Partners Celebrate 2017 Accomplishments
42. The Great Marsh Coastal Adaptation Plan Is Now Online

This year seems to be bringing good news for some of the PIE-Rivers river herring runs. The migration is still underway and the monitoring results have yet to be tallied, but herring returns on the Ipswich and the Essex already appear to be better than they have been in years. This apparent strong fish return has also allowed volunteers from Trout Unlimited Nor’east (NETU) to document the success of their efforts to improve river herring access past the Willowdale Dam on the Ipswich River.

The MA Division of Marine Fisheries (DMF) is working with the dam owners to replace the existing, deteriorating ladder with a new, better designed ladder by 2017. In the meantime, NETU has been making the best out of the existing ladder through ingenuity and perseverance. In 2015, NETU designed a set of custom-made boards to allow the crumbling fish ladder at the Willowdale Dam to be adjusted to improve fish passage and better attract migrating herring.

This year they saw their efforts pay off. On May 7th, NETU members adjusted the ladder according to guidance from DMF biologists and saw almost immediate results. Within 20 minutes of the adjustments they began to see herring darting up through the upper chambers of the ladder and into the river above. They reported 30-40 herring in just a short time. Very impressive numbers for a river that only saw 282 herring migrate past the Ipswich Mills Dam (4 miles downstream) the year before.

It is gratifying to see efforts like this meet with success. It is also timely that the improved passage coincided with a relatively good herring return. Hopefully these returning fish will spawn successfully and seed a good population of river herring to return as adults in four years. By then we hope they will be returning to a new fish ladder and better access to historic spawning locations farther up in the watershed.

Comments (0)

Leave a Reply

Your email address will not be published. Required fields are marked *

Back To Top